Energy Advisor · Workspace

Track your progress.

Track company or project checklist status on this device, then export a copy. Progress stays in this browser and does not sync to your member account.

Member Connect

Your checklist

0%Checklist complete
0Items marked complete
62Open items
LocalSaved in this browser

Workspace Starter beta: one company checklist and one project checklist are saved in this browser. They are visible to anyone using this browser and can be lost if its data is cleared. Export a copy to keep your progress. Completion is self-reported, not a project approval or investment recommendation.

1

Behind The Curtain

People, ownership, track record, conflicts, reputation and who is really responsible for the opportunity.

2

Entity Map

Map every operator, issuer, owner, affiliate, SPV, manager and intercompany relationship.

3

Sponsor Alignment

Understand sponsor capital, promotes, fees, related parties, downside exposure and alignment.

4

Location / Target

Define geography, well or project identifiers, formation, target interval and physical scope.

5

Acreage / Title

Verify acreage, ownership, leases, title, burdens, assignments and contractual rights.

6

Lease Clock

Track expirations, HBP status, development obligations and deadlines that can destroy value.

7

Surface / Access

Confirm surface rights, access, easements, utilities, local restrictions and operational access.

8

Money Raise

Define amount, timing, uses of proceeds, investor commitments and future funding requirements.

9

Capital Stack

Map equity, debt, preferred capital, carries, liens, guarantees and distribution restrictions.

10

AFE

Build and benchmark the authorization for expenditure from location work through facilities.

11

Investor Economics

Model WI, NRI, fees, waterfall, payout, IRR, MOIC and downside investor outcomes.

12

Deal Structure

Define the legal and economic vehicle, governance, voting, transfer, dilution and exit provisions.

13

Legal / Securities

Review securities structure, exemptions, solicitation, compensation, disclosures and filings.

14

Investor Eligibility

Document investor qualification, sophistication, risk capacity and offering eligibility.

15

Source of Funds

Verify funding identity, beneficial ownership, sanctions, wire controls and reconciliation.

16

Geology

Evaluate regional geology, stratigraphy, structure, depositional setting, charge, trap and seal.

17

Petrophysics

Evaluate logs, core, porosity, saturation, mineralogy, pay cutoffs and uncertainty.

18

Reservoir

Evaluate pressure, fluids, drive mechanism, recovery, drainage, spacing and reservoir behavior.

19

Reserves / Resources

Classify and validate reserves and resources, commerciality, maturity and independent estimates.

20

Offset Wells

Analyze complete offset populations, production, completions, failures and normalized performance.

21

Type Curve

Build and back-test defensible production type curves with uncertainty ranges.

22

Well Design

Design casing, cement, tubing, barriers, integrity and future intervention compatibility.

23

Drilling Plan

Plan rig, hydraulics, mud, bits, casing points, ROP, NPT and contingency.

24

BHA / Directional

Engineer BHA, MWD/LWD, trajectory, torque and drag, vibration, jar placement and fishability.

25

Well Control

Validate pore and fracture pressure, barriers, BOP, kick tolerance, H2S and emergency readiness.

26

Completion Design

Design stages, clusters, perforations, fluids, proppant, diversion and offset protection.

27

Flowback

Plan drawdown, choke, cleanup, sand, gas capture, temporary facilities and handoff.

28

Production Plan

Forecast and manage production, surveillance, chemistry, downtime, maintenance and accounting.

29

Artificial Lift

Select, size and optimize lift systems over the life of the well.

30

Facilities

Design production, measurement, storage, compression, automation and capacity.

31

Water / SWD

Plan sourcing, recycling, produced water, disposal capacity, UIC and seismicity exposure.

32

Midstream / Takeaway

Verify gathering, processing, capacity, fees, dedications, timing and contingency.

33

Marketing / Hedges

Evaluate purchasers, pricing, basis, differentials, hedging, collateral and counterparty risk.

34

Permits / Regulatory

Reconcile permits, orders, reporting, bonds, inspections, violations and jurisdictional requirements.

35

Environmental / Air

Evaluate air, methane, waste, spill, water, remediation, reclamation and environmental liability.

36

HSE

Evaluate safety systems, contractors, well control, H2S, pressure, lifting, fatigue and incident response.

37

Vendors / Supply Chain

Benchmark vendors, bids, capacity, lead times, credit, alternates and related-party exposure.

38

Operator Execution

Measure drilling, completion, production, cost, schedule, staffing and reporting performance.

39

Development Plan

Build inventory, sequencing, cadence, capital needs, lease retention and full-development logic.

40

P&A / ARO

Quantify plugging, abandonment, restoration, legacy environmental and retirement obligations.

41

Economics

Model production, pricing, ownership, costs, taxes, cash flow, payout, IRR, NPV and breakevens.

42

Stress Test

Test commodity, EUR, AFE, LOE, delays, water, downtime, failures and combined downside cases.

43

Reality Check

Compare forecasts with actual offsets, actual costs, medians, failures and observed field performance.

44

Risk Map

Create an explicit technical, commercial, legal, environmental, financial and reputational risk register.

45

Taxes

Review entity, federal and state, IDC, depreciation, depletion, severance and investor tax assumptions.

46

Accounting / Controls

Establish JIB, revenue, AFE tracking, approvals, reconciliations, fraud controls and reporting.

47

Insurance

Verify control-of-well, pollution, liability, property, D&O, cyber and other coverage and exclusions.

48

Data Integrity

Normalize identifiers, dates, formation, coordinates, production units, sources and audit trails.

49

Cyber / Systems

Protect accounting, SCADA, investor, land and technical systems with access and incident controls.

50

Documents

Assemble governing, land, regulatory, technical, commercial, financial and offering documents.

51

Data Room

Organize controlled, versioned diligence materials with access, Q&A and missing-document tracking.

52

References

Validate performance and conduct with investors, partners, vendors, professionals and counterparties.

53

Red Flags

Track inconsistencies, unsupported claims, missing records, pressure tactics and unresolved concerns.

54

Third-Party Review

Assign independent legal, engineering, geology, land, tax, environmental and economic review.

55

Investor Package

Create sourced, balanced investor materials that separate facts, forecasts, risks and assumptions.

56

Investor Fit

Evaluate investor eligibility, sophistication, liquidity, concentration and understanding of risks.

57

My Role

Define advisor, introducer, consultant, investor, communications, authority and compensation boundaries.

58

Communications / Claims

Control website, email, pitch, social, projection, reserve and performance claims consistently.

59

Investment Committee

Run formal multidisciplinary approval with conditions precedent and documented open issues.

60

Closing / Funding

Complete subscriptions, cap tables, ownership, funding, commitments, insurance and closing controls.

61

Post-Close Controls

Track drilling, cost, completion, production, cash, compliance, reserves and investor reporting.

62

Go / No Go

Make the final evidence-based decision on whether the opportunity deserves capital and reputation.